Carcassonne - Quatre Chemins Villa T6 208m² (147m² Hab.) with Garage, Garden, on a Plot of 11
Advert Reference: 3319
For Sale By Agent
Agency: Bernard ALA
This property has been brought to you by Green-Acres
Currency Conversion provided by
Wise
| €219,500 is approximately: | |
| British Pounds: | £186,575 |
| US Dollars: | $234,865 |
| Canadian Dollars: | C$322,665 |
| Australian Dollars: | A$362,175 |
Key Info
- Type: Residential (House)
- Bedrooms: 4
- Habitable Size: 147 m²
- Land Size: 1,135 m²
Property Description
In Carcassonne, on the outskirts of the Pasteur and Quatre Chemins neighborhoods, here is an authentic 1930s villa set on a large 1,135m² plot, tree-lined, landscaped, and secured by an automatic gate. Receding from the street that overlooks it, the residence develops 208m² of which 147m² are living space on two levels and 6 main rooms including 4 bedrooms.Following a classic plan, the main level is on the first floor, reached by two stair landings, one on the north side facing the street and the other on the south side facing the garden. It comprises a living room, a separate and equipped kitchen, two bedrooms of about 16m² each, a bathroom and a WC. Thus arranged, the daytime rooms offer a sweeping view of the surrounding garden and are notable for floors covered with beautiful antique cement tiles. The lower level is partly allocated to the dwelling, with two large bedrooms, a shower room, and a summer lounge directly opening onto the terrace and the garden. A laundry room hosts a summer kitchen. The level also includes a storage room and a comfortable 27m² garage. Outside, the garden is preceded by a large terrace, and a paved driveway leads from the gate to the garage. The main southern part of the garden is wooded and private, making it a true bubble of tranquility and greenery in the heart of the city. At the far end of the plot, there is a large garden shed where you can store wood as well as garden furniture and equipment.
Energy Consumption (DPE)
CO2 Emissions (GES)
Currency Conversion provided by
Wise
| €219,500 is approximately: | |
| British Pounds: | £186,575 |
| US Dollars: | $234,865 |
| Canadian Dollars: | C$322,665 |
| Australian Dollars: | A$362,175 |
Location Information
For Sale By Agent
Agency: Bernard ALA
This property has been brought to you by Green-Acres
Property added to Saved Properties