House of 178 m² on a 4935 m² Constructible Plot Near Goudargues
Advert Reference: 534
For Sale By Agent
Agency: PLEIN SOLEIL IMMO
This property has been brought to you by Green-Acres
Currency Conversion provided by
Wise
| €585,000 is approximately: | |
| British Pounds: | £497,250 |
| US Dollars: | $625,950 |
| Canadian Dollars: | C$859,950 |
| Australian Dollars: | A$965,250 |
Key Info
- Type: Residential (House)
- Bedrooms: 3
- Habitable Size: 178 m²
- Land Size: 4,935 m²
Features
- Garden(s)
- Land
Property Description
Discover this magnificent house of about 178 m², set on a superb 4,935 m² plot, offering a calm and privileged living environment near Goudargues. The main dwelling comprises a spacious bright living room with high ceilings, a functional kitchen with utility room, a ground-floor bathroom, 3 bedrooms including a spacious 45 m² one (possibility to divide to create several bedrooms), a study, and a mezzanine. You will also benefit from numerous outbuildings: double garages, cellar, greenhouse, car shelter, and pool shelter. Outside, the fenced and tree-covered plot is currently arranged with a above-ground pool, a wooden chalet, a vegetable garden, and a chicken coop. It also offers great potential due to its subdivisible nature and building-allowable character. A true haven of peace, ideal for nature and space lovers. Features: fireplace insert, underfloor heating, heat pump, air conditioning, very good energy performance (A), borehole, high-quality materials...
Energy Consumption (DPE)
CO2 Emissions (GES)
Currency Conversion provided by
Wise
| €585,000 is approximately: | |
| British Pounds: | £497,250 |
| US Dollars: | $625,950 |
| Canadian Dollars: | C$859,950 |
| Australian Dollars: | A$965,250 |
Location Information
For Sale By Agent
Agency: PLEIN SOLEIL IMMO
This property has been brought to you by Green-Acres
Property added to Saved Properties